Development & Aid, Environment, Headlines, Latin America & the Caribbean, Population

COLOMBIA: Wind Energy to Bring Public Services to Wayuu Reserve

María Isabel García

BOGOTA, Dec 1 2003 (IPS) - A wind generation park to be built on an indigenous reservation in the La Guajira peninsula, one of the poorest areas in Colombia, will provide funds for rural development efforts that are to benefit some 5,000 families.

Half of the earnings from the wind farm will go towards bringing badly needed public services – electricity, piped water and sewage systems – to residents of the Wayúu indigenous reserve on the peninsula located at the northernmost tip of Colombia.

The local governments in the municipalities of Uribia and Manaure, the indigenous reservation, and two private companies set up the Wayúu Public Services Company (Wayúu ESP), which will run the Wayúu Wind Park, sell the energy to the national power grid, and reinvest half of the revenues in creating infrastructure for public services.

Jorge Ibarra, a representative of the Wayúu reserve, commented to IPS that since 2000, when the Wayúu began to form part of the Wayúu ESP public services company, ”we have begun to see the possibility of improved living standards in the rural hamlets of Alta Guajira.”

The Wayúu indigenous community, which has a matrilineal social structure, makes up 30 percent of the population of the La Guajira region, and 90 percent of the population of the town of Uribia and the surrounding areas.

The Wayúu depend mainly on petty trade, fishing and goat-herding for their livelihood.

Around 1.5 million of Colombia’s 44 million people are of unmixed indigenous ancestry, including the roughly 150,000 Wayúu Indians in La Guajira. A large number of Wayúu also live across the border in Venezuela.

In the department of La Guajira, 64 percent of the inhabitants have their basic needs unmet – a proportion that climbs to 95 percent in the municipality of Uribia, according to a study on poverty in Colombia carried out by the National Planning Department.

The Wayúu wind farm will be built in an area between Cabo (Cape) La Vela and Puerto Bolívar, where the trade winds from the northeast blow strongest.

The plan is to install at least 15 60-metre-high windmills with 20 to 30-metre blades, to generate 20 megawatts – the maximum that Colombia’s laws allow for alternative energy plants joining the national power grid.

The windmills will harness the energy potential at the highest points on the peninsula, where the wind blows at an average rate of 9.8 metres per second.

The project organisers say the windmills will prevent 75,000 tons annually in carbon dioxide emissions that would occur if the same amount of power were generated by conventional means.

The Wayúu Wind Park will be similar to the Jepirachi Wind Power Project, the country’s first wind generation effort, which was built in the same region by public companies from Medellin with German technology and support from Germany’s technical cooperation agency GTZ.

The Jepirachi wind generation project, which will also form part of the national power grid, is to begin operating in early 2004, and the Wayúu wind farm in mid-2005.

The stipulation that 50 percent of the Wayúu Wind Park’s earnings are to be invested in the installation of infrastructure and rural development in the remote region was one of the reasons the project secured funding from the Dutch Programme for Economic Cooperation (PESP) and Export Transactions Relevant to Development (ORET).

The Dutch agencies will contribute 30 percent of the total cost of the project, estimated at 22 million euros, on the condition that at least 60 percent of the wind park’s technology is Dutch, and as long as there are guarantees of national or multilateral co-financing.

”The La Guajira wind park is a very clear example” of the kind of initiatives supported by the cooperation agencies of the Netherlands, Sylvia van Uden, business attaché at the Dutch Embassy in Colombia, told IPS.

The Wayúu reserve covers 90 percent of the rural portion of the municipality of Manaure, where 35,000 people live in 800 ”rancherias” – hamlets of five to 10 ramshackle homes scattered around the La Guajira desert, Ibarra explained.

The residents of the rancherias are organised in 40 associations of traditional indigenous authorities, said the Wayúu representative.

The La Guajira peninsula is divided into the Alta (high), Media (medium) and Baja (low) regions. The Wayúu wind generation project will serve the Alta and Media regions.

The deficit of basic services in the area to be served by the project is one of the highest in Colombia. While the local population needs 3.5 million cubic metres of clean water, supplies amount to less than one million cubic metres, and of a total demand for 35 million kilowatts of energy, less than 5.5 million kilowatts are currently available.

”Drinking water is urgently needed,” due to the high prevalence of water-borne diseases in the region caused by the lack of piped water, said Ibarra.

He expressed hope that bringing electricity to the rancherias would allow local indigenous families to refrigerate and freeze food, improve their diets, and set up small and micro-enterprises selling fish, as well as farm products that could be grown once irrigation is available.

The residents of urban areas in Manaure and Uribia get their water from desalination plants, while the families living in the rancherias depend on hand-driven wells and water pumping windmills for supplies during the prolonged dry season.

The rainy season in La Guajira only lasts from October to November, although some rain falls in the months of May and August.

According to the Latin American Energy Organisation (OLADE), eight million of Colombia’s 44 million people have limited or no access to electricity and piped water.

Selling wind power to the national energy grid will finance the installation of infrastructure in the rancherias, but under the format of ”individual solutions, because the rancherias are so widely scattered,” Fernando Gutiérrez at Acuaire, the company that designed the project, told IPS.

Acuaire, which forms part of Wayúu ESP, has already brought wind energy to homes in the area around Riohacha, the provincial capital, and in other spots along the country’s Caribbean coast, in the central Andean highlands region, and along the Pacific shoreline. But this is its first regional-level project.

Estrategias y Desarrollo (Strategies and Development), which specialises in energy and the environment, is the other private company that forms part of Wayúu ESP.

Gutiérrez said the governmental Institute of Hydrology and Meteorology is also interested in getting involved in the project.

He noted that ”if you compare the 20 megawatts that the wind park will generate to the national installed capacity of 13,000 megawatts, the project looks small, but the significance and impact for the community are immense.”

The biggest generator of wind power in Latin America is Costa Rica, where one public and three private wind farms have a total installed capacity of 66 megawatts. That Central American country is followed by Brazil (20 megawatts) and Argentina (14), according to a study by the non-governmental Biomass Users Network-Central America (BUN-CA).

Wind power in Colombia will supply the residents of ”more than 5,000 isolated rancherias in Alta and Media Guajira and 45 larger towns and villages with between 20 and 200 users, like Nazaret, Puerto Estrella and Taroa, where local distribution networks will be installed, and, eventually, small aqueducts, all of which will be based on appropriate technology,” said Gutiérrez.

In Colombia, 60 percent of the population lives in areas that are not connected to the national power grid, and the country is at at the point where it can begin to use alternative energy sources instead of oil and hydropower, both of which harm the environment, he said.

Connection to the national grid will mean continuous service and lower costs. In Bogota, a kilowatt hour of diesel fuel energy costs 30 times less than in many regions along the Orinoco and Amazon rivers and the Pacific and Caribbean coasts, said Gutiérrez.

Although the Wayúu wind generation project will not begin operating until 2005, Wayúu ESP is already carrying out educational efforts and consultations to determine the specific needs of local communities, based on experimental installations in several rancherias.

 
Republish | | Print |

Related Tags